Theme

Garutman · Assets & maintenance

From the log sheet to the closed fault.

Every simulator and aircraft with its certification and insurance, and simulator maintenance end to end: the instructor’s digital log, feedback and triage, deficiency reports, preventive maintenance within the DGCA tolerance, and reliability reporting.

  • 01A fault reaches a DR through triage, or at once as AOG
  • 02Preventive maintenance tracked against the DGCA 10% tolerance
  • 03MTBF, MTTR and availability per simulator, every month
Maintenance · Trainer A & FSTD baysAirworthy
Daily checks
5/7
Next due · tomorrow 06:00
RESOURCES

Simulators & aircraft

Every training device, with what it is and what it’s cleared for.

  • Model, serial number, capability and occupancy
  • Certification start and end, with expiry tracking
  • Insurer, amount and insurance end date
Resource · FSTD-1Garutman
Model
A320 full-flight simulator
Certification
To 14 Dec · 47 days
Insurance
To 30 Jun 2027
Occupancy
2 crew + instructor
MAINT

Maintenance scheduling

Maintenance booked on a resource with title, type, priority, date, time and recurrence.

  • Approved by a Training Administrator, then blocked on the booking calendar
  • Maintenance sits on the same calendar as training
Maintenance · FSTD-1Garutman
Title
Visual system recalibration
Recurs
First Sunday · 02:00–06:00
Priority
High
Approval
Training Administrator
Calendar
Slots blocked
LOG SHEET

Digital log sheet

The instructor’s simulator log: accept the device, verify the roster, start the session and log each interruption as it happens.

  • Cause, start and restored times per interruption, and breaks
  • Utilisation worked out: E = (B − A) − C − D
  • Signed digitally by instructor and customer to lock it
  • A printable log with customer-only and engineering-only bands
  • An interruption past the threshold raises an AOG DR automatically
Log sheet · FSTD-1 · 06:00Garutman
Start (A) → finish (B)
06:02 → 10:04
Break (C)
0:15
Downtime (D)
0:12 · 1 interruption
Utilisation (E)
3:35
Signed
FI-07 · Airline A
FEEDBACK

Session feedback & triage

The instructor’s rating, outcome and lost training time per session, then an engineer’s decision.

  • An engineering band: device failure time, PFC, sanitisation and sign-off
  • Triage queue: raise a DR or keep it as a comment, with a reason
  • Possible duplicate DRs shown before a new one is raised
  • Shift In-Charge corrections to a locked log, recorded with a reason
Triage · session 0412Garutman
Rating
4 of 5
Fault
Visual freeze on approach, 12 min
Duplicates
DR-FSTD1-118 looks similar
Decision
Raise DR
DR

Deficiency reports

Every simulator fault tracked from raised to closed.

  • Status, priority, ECD and impact on training
  • Corrective actions, comments, photos and video, and a Jira link to the OEM ticket
  • Closing a DR notifies the simulator’s recipients
  • My DRs: customers see the open DRs on their simulators
DR-FSTD1-121Garutman
Priority
High
Impact on training
Approaches restricted
ECD
Thu 20 Nov
OEM ticket
Linked in Jira
Status
In progress
PM

Preventive maintenance

Task masters with interval, standard duration and tolerance, released as weekly tasks.

  • The DGCA 10% tolerance by default
  • Engineers claim and complete tasks from a pool, server-timestamped
  • Tasks past tolerance flagged as breached
  • Changes and retirement need a reason
PM task · Motion actuator checkGarutman
Interval
Every 7 days
Tolerance
10% · DGCA
Claimed by
ENG-04
Status
Due in 1 day
KB

Knowledge base

Versioned task cards and documents for the engineering team.

  • Category, type and keywords
  • A new version supersedes the old one
  • Linked to a DR, or retired
Task card · Visual IG resetGarutman
Version
v4 · supersedes v3
Category
Visual system
Linked DRs
3
Status
Current
KPIs

Analytics & reliability

Monthly KPIs for every simulator.

  • Utilisation, availability, downtime and interruptions
  • DRs raised, closed, AOG and open at month end
  • MTBF, MTTR and interruption-free sessions
  • Month-end snapshot and Excel export
Reliability · FSTD-1 · OctoberGarutman
Availability
98.6%
MTBF
142 h
MTTR
1.8 h
DRs
6 raised · 5 closed · 0 AOG
SIM CONFIG

Simulator config

Per-simulator settings for the maintenance flow.

  • DR number prefix
  • Recipient lists for maintenance, scheduling and stakeholder emails
  • Every change needs a reason
Simulator config · FSTD-1Garutman
DR prefix
DR-FSTD1-
Maintenance emails
4 recipients
Stakeholders
Airline A ops
Last change
With a reason

Questions

Assets & maintenance in Garutman.

What does Garutman’s Assets & maintenance system include?

Garutman’s Assets & maintenance system covers Simulators & aircraft, Maintenance scheduling, Digital log sheet, Session feedback & triage, Deficiency reports, Preventive maintenance, Knowledge base, Analytics & reliability, Simulator config. Every simulator and aircraft with its certification and insurance, and simulator maintenance end to end: the instructor’s digital log, feedback and triage, deficiency reports, preventive maintenance within the DGCA tolerance, and reliability reporting.

What does Simulators & aircraft do in Garutman?

Every training device, with what it is and what it’s cleared for. In Garutman: Model, serial number, capability and occupancy. Certification start and end, with expiry tracking. Insurer, amount and insurance end date.

What does Maintenance scheduling do in Garutman?

Maintenance booked on a resource with title, type, priority, date, time and recurrence. In Garutman: Approved by a Training Administrator, then blocked on the booking calendar. Maintenance sits on the same calendar as training.

What does Digital log sheet do in Garutman?

The instructor’s simulator log: accept the device, verify the roster, start the session and log each interruption as it happens. In Garutman: Cause, start and restored times per interruption, and breaks. Utilisation worked out: E = (B − A) − C − D. Signed digitally by instructor and customer to lock it. A printable log with customer-only and engineering-only bands. An interruption past the threshold raises an AOG DR automatically.

What does Session feedback & triage do in Garutman?

The instructor’s rating, outcome and lost training time per session, then an engineer’s decision. In Garutman: An engineering band: device failure time, PFC, sanitisation and sign-off. Triage queue: raise a DR or keep it as a comment, with a reason. Possible duplicate DRs shown before a new one is raised. Shift In-Charge corrections to a locked log, recorded with a reason.

What does Deficiency reports do in Garutman?

Every simulator fault tracked from raised to closed. In Garutman: Status, priority, ECD and impact on training. Corrective actions, comments, photos and video, and a Jira link to the OEM ticket. Closing a DR notifies the simulator’s recipients. My DRs: customers see the open DRs on their simulators.

What does Preventive maintenance do in Garutman?

Task masters with interval, standard duration and tolerance, released as weekly tasks. In Garutman: The DGCA 10% tolerance by default. Engineers claim and complete tasks from a pool, server-timestamped. Tasks past tolerance flagged as breached. Changes and retirement need a reason.

What does Knowledge base do in Garutman?

Versioned task cards and documents for the engineering team. In Garutman: Category, type and keywords. A new version supersedes the old one. Linked to a DR, or retired.

What does Analytics & reliability do in Garutman?

Monthly KPIs for every simulator. In Garutman: Utilisation, availability, downtime and interruptions. DRs raised, closed, AOG and open at month end. MTBF, MTTR and interruption-free sessions. Month-end snapshot and Excel export.

What does Simulator config do in Garutman?

Per-simulator settings for the maintenance flow. In Garutman: DR number prefix. Recipient lists for maintenance, scheduling and stakeholder emails. Every change needs a reason.

Next systemInventory & storesThe spare you need, down to the bin.

Cleared for takeoff

Run your next flying day on Garutman.

We're onboarding a small first group of ATOs and flight schools. Pick a time and we'll walk your Head of Training through a live day of your operation.